Control new-product and transfer risk from day one
NPI and transfer projects fail when documents, tooling, materials and test criteria are not aligned. We structure the plan, engineering inputs, ownership and readiness gates so every team works from the same status.
Support scope
- Product and process requirement review and gap analysis
- BOM, drawing, Gerber, software, checksum and test specification
- ICT/FCT flow, fixtures, tooling and acceptance criteria
- Material, machine, method, manpower and measurement readiness
- Trial plan, build quantity, defect logging and issue escalation
- ECN, change points, golden samples and traceability
- Transfer checklist, risk register, open issues and mass-production sign-off
Suitable for
EMS factories, NPI, Process, Test, Quality and Project teams, and companies transferring products to a new manufacturing site.